Deep excavation design involves more than just making calculations and reports. A significant part of the time engineers spend on deep excavation designs is lost in collecting all design conditions. That is why CloudPiling invests heavily in supporting engineers in collecting the design conditions efficiently.
Unlike the traditional way of working, you get an end-to-end design tool for deep foundations. This minimises the effort required to calculate an iteration to the absolute minimum and avoids errors when retyping numbers between different partial solutions. As an engineer, this allows you to fully concentrate on what really matters during design: the optimal deep foundation design.
Deep Excavations Pile Foundations
Technical note Techniques Advanced developments
The typical functionalities of conventional incomplete design software for deep excavations:
The enhanced functionalities that make CloudPiling a true end-to-end design tool:
The software supports calculations for the following retaining structures:
Some examples of advanced developments that help speed up your design process:
The typical functions of conventional pile foundation design software:
What CloudPiling does differently, and more:
Calculations can be performed for the following pile foundation techniques:
CloudPiling develops its algorithms 100% in-house, resulting in faster computation speeds and providing the framework for a truly future-proof solution. Full control over the software allows us to innovate rapidly and efficiently integrate technologies such as artificial intelligence. The accuracy of the calculations is ensured through a continuous verification and validation process, supported by independent review. Anyone can verify the correctness of the calculations themselves via app.cloudpiling.com/verification_and_validation.
CloudPiling not only offers an end-to-end solution, but is also strongly committed to the further development of its software. By offering the software as a Cloud application, users always have access to the latest version.
Easily track project progress with our revision management system and study different alternatives at each stage to find the optimal design, enabling you to make quicker, more informed decisions throughout your project.
| Guidelines | BELGIUM | THE NETHERLANDS |
|---|---|---|
| Soil stratigraphy | WTCB / ANNEX Eurocode 7 | NEN 9997-1 |
| Bearing capacity | WTCB (De Beer Method) | NEN 9997-1 (Koppejan Method) |
| Vertical settlement | WTCB API |
|
| Horizontal soil–structure interaction | Ménard CUR166 |
|
| Structural design |
Eurocode 2, 3 and 4 Soilmix Wall Handbook CUR166 |
|
| Soil anchors | Eurocode 3 + WTCB | CUR166 |
Using the paragraph selector, users can specify which paragraphs should be included in the reports. The reports are then generated automatically. Reports can be rendered in multiple languages (English, Dutch...). With the use of the project share link, you can efficiently send the reports to external parties for approval. In addition, project-specific bills of quantities can be exported with a single click, convenient for cost estimation, procurement, and logistics planning.