Beeuwsaert Construct sees clear opportunities for optimisation
Didier and Jeroen Beeuwsaert founded Beeuwsaert Construct in 2004, a family-run business focused on industrial and agricultural buildings. Think of stables, warehouses, office buildings and storage facilities. In addition to years of experience, the company is defined by entrepreneurial spirit, flexibility and an innovative mindset aimed at serving clients as effectively as possible.

Study case as starting point
We were introduced to one another through a specific project and shared connections. One phone call was enough to set up a meeting and define the purpose. Beeuwsaert Construct asked CloudPiling to recalculate the foundation design of a factory project using our design tool. The results, with a focus on material savings and CO₂ reduction, were presented to the company’s director and their head of engineering.
Result?
By applying eccentric loading to the piles, the number of piles could be halved. A larger pile diameter and heavier reinforcement cages were used to handle the upper structure’s load. This led to a material reduction of 10%.
The total material quantity was optimised by 40% by adjusting the concept and removing the pile caps.
Greater computational power reinforces engineering judgement
This case demonstrates that giving engineers more computational capability can lead to rethinking design concepts, ultimately strengthening and enhancing engineering judgement.